Soluna Holdings, Inc. (NASDAQ: SLNH) reviews third-quarter 2026 financial results and provides a business update.
CEO John Belizaire, Chief Development Officer Ryan Carver, and CFO Michael Picchi walk through the quarter, including AI/HPC development at Projects Kati 2 and Dorothy 3, and third-quarter financial results.
Read the Q2 2026 press release: https://www.solunacomputing.com/news/q3-2026-results
Mike Tu — Open & Safe Harbor
Slide 1 — Title
Good afternoon, and thank you for joining Soluna’s third-quarter 2026 earnings call.
Our earnings release and the accompanying presentation are available in the investor relations section of solunacomputing.com, and this call is being webcast with the presentation.
Slide 2 — Speakers
With me today are John Belizaire, Chief Executive Officer; Ryan Carver, Chief Development Officer; and Michael Picchi, Chief Financial Officer.
Slide 3 — Legal Disclosure
Before management begins their formal remarks, we would like to remind everyone that some statements we’re making today may be considered forward-looking statements under securities laws and involve a number of risks and uncertainties. As a result, we caution you that there are a number of factors, many of which are beyond our control, which could cause actual results and events to differ materially from those described in the forward-looking statements. For more detailed risks, uncertainties and assumptions relating to our forward-looking statements, please see the disclosures in our earnings release and public filings made with the Securities and Exchange Commission. We disclaim any obligation or undertaking to update forward-looking statements to reflect circumstances or events that occur after the date the forward-looking statements are made, except as required by law. We will also discuss non-GAAP financial metrics and encourage you to read our disclosures and the reconciliation tables to applicable GAAP measures in our earnings release carefully as you consider these metrics. We refer you to our filings with the Securities and Exchange Commission for detailed disclosures and descriptions of our business, as well as uncertainties and other variable circumstances, including but not limited to risks and uncertainties identified under the caption ‘Risk Factors’ in our Annual Report on Form 10-K for the year ended December 31, 2025, and our other SEC filings.
One reminder before we begin. Effective last quarter, we present pass-through electricity costs on a gross basis rather than net. That change increases both reported revenue and reported cost of revenue by the same amount and has no effect on gross profit, operating loss or net loss. Prior periods are not revised, so year-over-year revenue comparisons include the change. Affected slides are footnoted.
With that, I’ll turn it over to John.
John Belizaire — Business Highlights
Slide 4 — Company Overview
Thanks, Mike.
Hello, and welcome to Soluna’s third quarter results and business update.
I want to start by acknowledging the environment. It’s been a difficult market, and many of you are feeling it. We are too. So we’ll keep today focused on what we’re doing and where we stand on what matters most: converting our AI campuses into signed leases.
The thesis hasn’t changed. Power is the primary constraint in the AI era. Soluna secures long-term, behind-the-meter access to power at scale, and we build data centers directly on renewable-generation sites.
Four numbers frame where we stand.
Revenue grew 80% year over year, our sixth straight quarter of sequential growth. Excluding the presentation change Mike described, revenue grew 29%.
We now have 206 megawatts of capacity under management, following the completion of Kati 1 in September.
We have more than 650 megawatts of planned AI capacity across our two campuses in early construction, Kati 2 and Dorothy 3.
And our renewable power development pipeline stands at more than 6.3 gigawatts.
Slide 5 — Business Highlights Q3 2026
Let’s get into the quarter.
Slide 6 — Our Accomplishments in Q3 2026
On the business side, three things.
First, the team. Ryan joined us as Chief Development Officer in July, and he has since brought on Neil Robinson as Vice President of Construction and Michal Stark as Vice President of Planning. We are investing in this team now so that we have construction, engineering, planning, and procurement leadership in-house as we scale the AI business, and are prepared to move as our campuses advance.
Second, the balance sheet. We prepaid our Generate facilities at Dorothy 1A and Dorothy 2 in August, and after quarter-end we repaid the remaining Generate balance at Briscoe Wind. With Briscoe’s debt repaid, we are positioned to redirect power from the Briscoe Wind Farm to Dorothy 3 AI campus now under construction. We ended the quarter with $109 million in cash.
Third, power. In September, ERCOT classified 266 megawatts across our Kati and Dorothy campuses as Base Load in its Batch Zero process. These classifications preserve each campus’s existing interconnection capacity and exempt it from further reliability evaluation and megawatt allocation in the Batch Zero study. A request for an additional 50 megawatts at Dorothy is under study.
On the project side, Kati 1 is complete at 83 megawatts, and Kati 2 and Dorothy 3 both advanced into construction work after quarter-end.
Commercially, at Dorothy 3, we signed a subscription agreement with Applied Digital on October 20 to form a joint venture for a planned 50 megawatts, and ChronoScale has signed a non-binding letter of intent to lease that facility. At Kati 2, we chose not to renew our prospective tenant’s exclusivity and remarketed the site. We have now entered into a new, non-binding letter of intent with a different potential tenant. Ryan will take you through both campuses.
A word on the policy environment. Texas will have new leadership in Austin, and policymakers at every level are taking a closer look at data center development.
We built our model with their questions in mind. Renewable Computing uses clean power – including wind and solar – that already exists and might otherwise be curtailed, rather than adding new strain on the grid. It’s designed to protect the communities we’re part of while connecting them to the jobs and investment that come with the future of innovation.
We’ve been making that case in person: we hosted public open houses for Dorothy 3 in Briscoe County in October and for Kati 2 in Willacy County in November. Ryan will share more in our community update ahead.
With that, I’ll hand it to Ryan to walk through our pipeline and AI development. Ryan?
Ryan Carver — AI Project Highlights
Slide 7 — AI Projects Update
Thanks, John. Good afternoon.
I’ll take you through our AI project updates for the quarter.
Slide 8 — Our AI/HPC Development Projects
We’ve dedicated projects in our existing pipeline to AI, and our AI/HPC development portfolio now totals approximately 1.7 gigawatts.
This chart shows where each project sits, from site control and power through design, financing, and construction. Today I’ll zoom in on the two projects in development, Kati 2 and Dorothy 3.
Slide 9 — Project Kati 2
Kati 2 sits across the street from Kati 1 in Willacy County. It is planned at more than 350 megawatts at full build.
In the third quarter, we brought our general contractor on board and advanced the Phase I design into construction documents. We ordered long-lead equipment. Engineering is underway to expand the Las Majadas substation by 100 megawatts, and we executed a gas pipeline access agreement.
Since quarter-end, civil and earthworks started in October, and we received our sales and use tax exemption. And on November 12, we hosted a public open house in Raymondville for Willacy County residents.
On the tenant: last quarter, we told you we had signed a letter of intent for Kati 2. During the quarter, we decided not to renew that tenant’s exclusivity, because we did not expect the tenant to meet the credit requirements we set for a lease of this size. We remarketed the site, which generated strong customer interest and demand. We have signed a new letter of intent with a new customer that we expect to meet our credit requirements. We’ll update the market when we have a definitive agreement to announce.
Slide 10 — Dorothy 3 Partnership with Applied Digital
Now to Dorothy 3, starting with the partnership we announced in October.
We signed a definitive agreement with Applied Digital to form a jointly owned project company for a planned 50-megawatt AI data center, which will be the first phase of Dorothy 3. At closing, Applied Digital is expected to own 51% and Soluna 49%.
Both partners fund development in line with their ownership, and Soluna also contributes land and power assets. Applied Digital brings AI data center experience. Soluna brings a wind-powered site with power generation we own. ChronoScale has signed a non-binding letter of intent to lease the facility, and lease negotiations are underway.
Closing is expected by early December, subject to remaining conditions.
Slide 11 — Project Dorothy 3
Dorothy 3 is planned at more than 300 megawatts on 397 acres next to our Briscoe Wind Farm.
In the third quarter, we closed on the land in August, launched master planning and long-lead procurement, and completed environmental, water, survey, and fiber studies.
Since quarter-end, we hosted a public open house in Silverton on October 2, and construction work also began in October. We received our sales and use tax exemption, and on November 9, Briscoe County approved a tax abatement agreement for the project. With the Generate debt at Briscoe repaid, we can now direct power from the wind farm to the campus.
Slide 12 — Path to Leases
This slide brings both campuses together: what we completed in the third quarter, what’s done or in motion since, and what comes next.
At Kati 2, the third quarter was about design and procurement. We brought on our general contractor, moved Phase I into construction documents, ordered long-lead equipment, started the Las Majadas substation expansion, and executed a gas pipeline access agreement. Since quarter-end, civil and earthworks have started, we received our sales and use tax exemption, and we hosted a public open house in Raymondville on November 12th as part of the property tax abatement process. With a signed LOI, we expect the next milestone announcements to be a signed lease and project financing.
At Dorothy 3, we closed on the land in the third quarter, launched master planning and long-lead procurement, and completed site studies. Since quarter-end:
- we signed the definitive agreement with Applied Digital for Phase 1
- construction work started
- we received our sales and use tax exemption
- Briscoe County approved the property tax abatement on November 9
- we repaid the Generate debt, freeing Briscoe’s power for the campus
Closing the Applied Digital joint venture is in progress and expected by year-end, subject to remaining conditions. The next milestones are converting the ChronoScale letter of intent into a signed lease and the first RFS tranched delivery.
And as John mentioned, both campuses build on power we already hold: Kati 2, Phase 1 sits within the 166 megawatts of Base Load at Kati, and Dorothy 3 Phase 1 within the 100 megawatts at Dorothy.
The milestones marked “targeted” don’t have committed dates. We’ll report on them as they happen.
Slide 13 — Community Update
One more topic before I hand off, because investors have asked about it and it matters to how we build.
Communities and policymakers across Texas are taking a closer look at data center development. Our approach is to engage early and in public. Over the past six weeks, we hosted open houses in both counties, with bilingual materials and a dedicated community engagement lead.
A few proof points:
- Power. Both campuses are co-located with sustainable wind power and connect to the high-voltage system, not the local lines that serve homes.
- Water. Cooling is designed to be a closed loop system, using minimal water.
- Sound and light. The Dorothy 3 agreement sets sound limits at nearby homes, measured by an independent consultant, along with shielded, downward lighting standards.
- Economic opportunity. Phase 1 is expected to create about 21 full-time jobs at Dorothy 3 and about 40 full-time jobs at Kati 2 once fully operational, with a preference for local workers and vendors.
With that, I’ll hand it to Mike Picchi for the financials. Over to you Mike.
Michael Picchi — Financial Highlights
Slide 14 — Financial Highlights
Thanks, Ryan.
I’ll cover the balance sheet, the P&L, and how we used capital in the quarter.
Slide 15 — Balance Sheet Q4 2025 vs. Q3 2026
Let me start with the balance sheet, compared with year-end 2025.
We ended Q3 with $109.3 million in cash available for project development and operations, up 43% from $76.4 million at year-end. Our current ratio improved to 2.5 times from 1.9 times, and working capital is positive $76.9 million, up from $42.9 million at year-end.
On the asset side, net property, plant and equipment nearly doubled, to $147.4 million from $74.8 million at year-end. That’s the Briscoe Wind Farm acquisition in April for $54.4 million, $10 million for the Dorothy 3 land acquisition, and buildout capex and equipment deposits of $28.9 million, primarily for the completion of Kati 1 and continued development of Kati 2, partially offset by depreciation expense in the year-to-date period. Soluna has been deploying capital into hard assets that will generate future returns. Total assets were $297.7 million, up from $187.9 million at year-end.
On the liability side, total liabilities fell to $67.1 million from $75.7 million at year end, and total debt, net of issue costs, fell to $16.7 million from $26.8 million at year-end. Last quarter, I told you we had reclassified our Generate debt to “current” because we intended to repay it. We did. In August, we prepaid the Generate facilities at Dorothy 1A and Dorothy 2. And after quarter-end, we paid off the remaining Generate debt tied to the Briscoe Wind Farm and extinguished the Generate loan facilities. Thus, while September 30th debt was $16.7 million, net of issue costs, after the October final repayment of Generate, total debt balances are under $8 million. Using Soluna cash to pay off debt has three benefits: first, de-leveraging in uncertain AI market times is prudent, second, with the Generate liens on the bitcoin and wind farm assets released, Soluna can begin executing on re-deploying those assets toward AI projects, and third, Soluna now has financial flexibility to reset the capital structure for the new AI programs we’ll need to fund when we’re successful signing new leases.
In the equity portion of the balance sheet, we raised $170.1 million year to date through the ATM and SEPA programs. Here’s where it went:
- $51.4 million, net cash for the Briscoe acquisition;
- $28.9 million to capex and equipment deposits;
- $20.1 million to buyout the JV partners at Dorothy 1A and Dorothy 1B; and
- $40.5 million to debt repayment, including the $19.1 million Generate prepayment in August
The remaining portion of the equity raises supported operations in the form of $32.9 million going back onto the balance sheet as an increase in the cash balance.
The short version: we own more infrastructure, we have less debt, and we have more cash than we started the year with.
Slide 16 — Revenue by Quarter
Turning to the P&L.
Revenue was $15.1 million, up 80% year over year and roughly flat sequentially, our sixth straight quarter of sequential growth.
Excluding the change in presentation of pass-through electricity costs we adopted last quarter, revenue grew $2.4 million, or 29%, year over year, on higher hosting and leasing revenue.
Sequentially, lower site availability reduced volumes across our bitcoin sites by about $700,000. That was offset by revenue recognized on a leasing contract termination at Sophie.
By specific revenue line: data hosting revenue was $12.4 million, up from $5.3 million a year ago. Wind generation added $594,000, net of intercompany elimination. Offsetting that, proprietary mining revenue declined $916,000, or 33%, on a 37% decline in average hashprice.
Slide 17 — Gross Profit by Quarter
Gross profit was a loss of $1.9 million, compared with a profit of $2.3 million a year ago and $766,000 last quarter.
Here’s what drove that: the Briscoe Wind Farm carried $3.0 million of unscheduled turbine repairs and maintenance in the quarter. Excluding those repairs, gross profit would have been $1.1 million, a 7.5% gross margin.
Underneath the consolidated number:
- Data hosting delivered $1.7 million of segment gross profit, the largest contributor.
- Demand response contributed $251,000 of gross profit, at effectively full margin.
- Proprietary mining posted a gross loss of $508,000, on hashprice compression.
- Wind generation posted a gross loss of $3.3 million, including the repairs.
Slide 18 — Adjusted EBITDA by Quarter
Net loss was $34.3 million, compared with $25.8 million in Q3 2025. The absence of a $22.0 million fair value adjustment loss from a year ago was more than offset by $17.0 million of higher G&A, including $14.0 million of non-cash stock-based compensation expense, and a $15.8 million unfavorable change in debt extinguishment: a loss on the Generate prepayment this year, compared with a gain on the New York Digital Investment Group settlement last year. Lower financing costs of $4.7 million were partially offset by $4.2 million of lower gross profit.
Adjusted EBITDA was a loss of $7.5 million, compared to a loss of $1.6 million in Q2 and $6.4 million in Q3 2025.
Sequentially, Adjusted EBITDA declined by $5.9 million. This was driven by $3.0 million in Briscoe repairs and $2.5 million in AI/High Performance Computing business development activity, including legal and advisory costs and the evaluation of new power and data center sites.
Year over year, Adjusted EBITDA declined $1.1 million. Excluding the $4.7 million of financing costs in Q3 2025, it declined $5.8 million. The drivers were:the $3.0 million of Briscoe Wind repairs
- $3.1 million of higher cash G&A from legal and consulting costs, and added headcount
- And lower mining margins
Those were partly offset by higher hosting revenue and margin contribution.
Full reconciliations are in the appendix and the earnings release.
Slide 19 — Sources & Uses of Capital Q3 2026
Now to capital, which is the part I focus on and get the most questions about.
When discussing the equity section of the balance sheet earlier, I mentioned the $170.1 million we’ve raised YTD through the ATM and SEPA.
For Q3, sources and uses totaled $46 million. We raised $37.7 million through the ATM program, issuing 30.4 million shares. The remaining $8.2 million came from cash, as cash and restricted cash went from $131 million at June 30 to $123 million at September 30.
And here’s where it went in Q3:
- $22.5 million to debt repayment, mainly the Generate prepayment
- $13.8 million to net capex and equipment deposits, mainly the Dorothy 3 land and Kati 2 deposits
- $9.7 million to working capital and other, mainly HPC-driven G&A
Subsequent to quarter-end, on October 22, we repaid the remaining Generate balance at Briscoe Wind. The facility has been terminated, and Generate’s liens on the project assets have been released. Together with the August prepayment, that reduced total debt from $37.9 million at June 30th to $7.7 million.
At our 2026 annual meeting on October 16, stockholders approved an increase in authorized common stock from 375 million shares to 1 billion shares, and the issuance of shares above Nasdaq’s 20% limit under our Yorkville SEPA.
Slide 20 — The Financial Opportunity in a Single AI Campus
Now let me close on how we intend to fund what Ryan described.
Winning an AI contract requires investment before the contract exists: fiber studies, environmental and geotechnical work, long-lead equipment deposits, site design, joint venture formation, and securing power. A customer performing diligence on a site is evaluating work that has already been done. You cannot wait to be awarded a contract and then begin.
Our policy for the large buildouts is project-level debt. For a 100-megawatt buildout, which we estimate at $1.2 to $1.3 billion, we would target 70% to 80% project-level debt, sized against the contracted tenant cash flows under the lease. The remaining 20% to 30% would come from a mix of Soluna contributions, third-party project equity and tenant-provided prepaid rent. Our joint venture with Applied Digital at Dorothy 3 is an example of that partnership structure, with each partner funding in line with its ownership.
We would expect that debt and equity formation to occur in the eight-to-twelve-week period following announcement of a signed lease. Having capital already available to begin construction in that window is another use of the cash on our balance sheet.
Our existing operations and our AI projects are capitalized separately, at the project level, which gives each access to capital appropriate to its risk profile.
This is how we plan to underwrite an AI lease.
At the lease rates currently being struck in this market, for critical IT capacity on long-duration, triple-net terms, a 100-megawatt, 15-year contract would generate sufficient revenue and net operating income to service and retire the project-level debt and deliver a strong multiple on the equity invested.
The illustrative case on this slide shows roughly $180 million of stabilized annual net operating income against an estimated $1.2 to $1.3 billion buildout, based on the assumptions disclosed here. When we do reach an agreement, the results may differ materially.
I offer it to explain why we are investing ahead of a contract. It is not a forecast. And consider that this is just the first 100 megawatts of our AI pipeline, with expansion possibilities at each campus and additional projects to layer on top.
In summary: Q3 was a quarter of execution and deleveraging. We completed Kati 1, repaid our Generate facilities at Dorothy 1A and Dorothy 2, and, after quarter-end, at Briscoe Wind. We ended the quarter with $109.3 million in cash and continued investing in Kati 2 and Dorothy 3.
With that, I will hand it back to John.
John Belizaire — Closing
Thanks, Ryan and Mike.
Let me close with where this leaves us.
Look at Dorothy 3 today. We own the land. The wind farm next door is ours, and its debt is repaid. ERCOT has classified the campus’s power as Base Load. Construction work has started. We’ve signed an agreement with Applied Digital to form a joint venture, and ChronoScale has signed a letter of intent to lease the facility.
Land, power, construction, a partner, and a prospective tenant. Those are the building blocks of an AI campus, and at Dorothy 3 they’re in place. The next steps are closing the JV and a signed lease.
Kati 2 is moving too, with earthworks underway and a new tenant LOI signed this month.
And we’ve built the company to deliver: construction and procurement leadership in-house, $109 million in cash, and a financing approach, which Mike walked you through, built to move quickly once a lease is signed.
That’s how we turn power into AI campuses. And it’s all built on clean energy that might otherwise be curtailed.
That’s Renewable Computing, and it’s our mission: to make renewable energy a global superpower, using computing as a catalyst.